people4project GmbH
Lörenskogstr. 3
85748 Garching b. München
Mo-Fr 9.oo - 17.oo Uhr
+49 (89) 55 29 39 -40
Projekte im Werdegang |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04/2015 - | MS Dynamics NAV (Navision) Test consultant for MisterSped.de in Berlin. Main focus test case creation for backend system and MS Nav Test consultant |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10/2013 - 08/2014 | Unit Testing, Risk Management/Basel II, SAP-WM - Warehouse Management, Middleware/Transactions Test manager for TEL (Dublin) Magnetic solutions for control software creation for semiconductor production. This job covers Test management from all areas from unit testing to acceptance and risk management requirement gathering, test phase planning, reporting etc. Daily tasks were: Controlling testing process and resource planning and daily line management tasks for test personnel This software co-operates with SAP and interface with SAP is critical for testing Interface works with WM, SD and MM modules and middleware is software. Main tasks in this project have been so far create test process, create quality process, create inspection process and design test automation environment. Define and maintain test and SW development environment. Environment covered integration, test management and test automation environment. This project was hands on test manager project. During this project my task was create needed templates for SW testing and create main process for SW testing Test manager |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01/2013 - 08/2013 | Network Automation test manager for Tektronix (Dublin) to improve automation test coverage in Mobile network monitoring software. This software is intended to monitor networks from 2G to latest 4G and variants. Test management task covered test planning in Agile environment based on requirement inbox. Tasks covered test planning, risk assessment, design test automation environment, create roadmap for critical test automation and create templates for future development One of tasks was maintaining integration with test management environment and continuous integration environment. This project was hands on test manager project Automation test manager, test manager |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06/2012 - 10/2012 | Android, Apple iOS Architect for mobile health app for mobile usage. This product is multiplatform app and is made for WinPhone, Android and iOS paltforms. In this project I also created first version of test strategy and test plan documents Architect |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03/2012 - 05/2012 | SAP-WM - Warehouse Management, Asset and Liability Management Valtra SAP WM project. This project covers retesting process and transports in WM area. Test plans were planned based on COGI error logs and process descriptios. Updating process based on experience and solving daily issues in production environment. During this period main issue was large amount of COGI errors in system. Mainly this was due to poor master data management and poor testing before go-live. During this period large amount of communication was needed towards management and end users. In this project was needed large amount of retesting of system and hands on work with environment. In this project I was also taking Solman in use for issue and test areas and integration with HP ALM |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01/2011 - 08/2011 | Mercury WinRunner/QualityCenter, Asset and Liability Management, Mercury LoadRunner process definition for test management and error management areas. manager work covered version 7.0 and test, change control, business process, Solution also used in this period. Upgrade of HP tools also covered QTP/UFT and LoadRunner environments. During in more solution monitoring and administration. Selenium was this project test strategy was improved and test process was defined detailed Project to roll-out SAP Solution Manager, roll-out SAP Solution Manager and HP, ALMintegration project Manager, SAP Solution manager, error management areas. manager, LoadRunner |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05/2010 - 08/2010 | SAP-BW - Business Information Warehouse, Storage, Mercury WinRunner/QualityCenter Vodafone (telco sector). Project was targeted to improve storage handling area information. This project covered functional testing, UAT, performance testing etc Smoke and performance testing areas were automated. Project was done on time Main testing tools were QualityCenter, QTP/UFT and Selenium. Target was automated testing as much as and budget, long term results possible. can be seen later program manager |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01/2010 - 03/2010 | Mercury LoadRunner SAP performance test manager for RIM. There was need for performance improvement in SAP. Test scenarios were made based on end-user profiles, performance improvement was 20% and performance testing was done from end-user locations. Main findings were found from OS level configurations. Project was done on time and budget. Performance testing was automated with QTP/UFT and LoadRunner tools. Performance testing was automated SAP performance test manager, LoadRunner |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12/2009 - 01/2010 | Logistics, Finance Architect for new type of art e-commerce product. Target is create global e-commerce platform for art auction in modern art. Tool is integrated with SAP to get logistics information for seller and buyer. SAP is also used for financial information collection. This work is done parallel with other projects and wasn't a full time role. Product will be launched in Dec 2010 for European markets This project was part time and overlapping with next one Architect, seller, buyer |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09/2009 - 12/2009 | SAP-PM - Plant Maintenance SAP PM test manager for Centrica in energy sector. Main task was creating test plans, test strategy and do staffing of test team. Project was done on time and budget. Smoke and performance tests were automated. This covered SAP IS SAP PM test manager |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09/2009 - 02/2010 | Android, Apple iOS Architect for mobile solution for warehouse information collection tool. Tool is integrated with SAP, tool is in limited test usage and will be launched early 2011. Product will use RFID and low-energy Bluetooth to collect warehouse data. Target was create cost efficient alternative for information collection Detailed product information isn't publicly available until 2011. This product is planned to use in Android, Win-phone and iOS platforms Architect |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09/2009 - | Contractor
Test Manager
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06/2007 - 08/2009 | SAP-ERP - Enterprise Resource Planning Accenture Test Community Lead During this period I was leading test community in Finland and I was responsible of recruiting new persons in testing area. I was also responsible developing testing methods and capabilities in testing area. In this time I was leading test framework development for Accenture Finland. Framework was developed top of Rational tools Same time I was test manager in SAP/ERP program for Nokia-Siemens-Networks spare part handling and procurement areas. In this test manager position I was responsible also of risk area. He also was project manager for Nokia HR service data center move. Testing in SAP environment was automated in performance test and smoke test areas. During this period test strategy and process development was my task test manager, project manager |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01/2003 - 01/2005 | Asset and Liability Management, Mercury WinRunner/QualityCenter responsible of starting global deployment of TestDirector(Currently HP ALM) and established a network of local concept owners. During this period I was also responsible developing full test management process with concept owners. In this project method and process was developed to share test assets between projects and units. During this period common templates were developed and common roles for test management. During this process I guided release planning for this solution This TestDirector installation is one of the largest in a world and currently user base is 18000 named users and usage is 24x7 in all time zones. This time I was also responsible integrating test automation tools with HP QualityCenter |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01/2002 - 01/2003 | Mercury LoadRunner During this period I was responsible arrange testing systems for S60 phone programs in Jyvaskyla Campus. Main activities were automating basic testing and evaluating suitable tools for that. During that period Mercury (Currently HP) and Rational tools came known in detailed level. Small amount of time was used for performance testing and for reliability testing. During this period test management renewal was started. Tools used in this period were LoadRunner, Testquest NetHawk, etc LoadRunner |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04/2000 - 05/2007 | SAP-SCM - Supply Chain Management (FSCM), Requirement Management, Mercury WinRunner/QualityCenter position I was responsible of leading testing development in Nokia handset R&D. During this period I was responsible of process update. New updated process will use same elements in all testing layers and is approved by all business units Integration to other R&D system has been a main activity and integrations are done between error management-SCM-TM in system level and in process level also for requirement management and architecture management. Process contains result reuse methodology. Reporting improvements have been in central point during this period and harmonization of reporting has been major activity. During this period SAP Solman was integrated with HP QualityCenter During this period I was responsible to develop automation framework for handset testing in Nokia R&D Framework was based on HP tool suite Test Concept Manager |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01/2000 - 01/2003 | Configuration Management, Linux, Release Management position I was responsible of development, maintenance and budgeting of R&D infrastructures of Nokia Jyvaskyla R&D. Main task was updating software configuration management platform. During this period SW builds were transferred to Linux platform and software configuration management system was replaced. Build times were reduced from 2h 40 min to 40 min. Release management was taken in use for all tools |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08/1998 - 03/2000 | Production Engineering, CAD/CAM Patria position I was responsible of evaluation and deployment of new CAD system Technologies and methods: CAD, C Production Engineer |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04/1996 - 07/1998 | CAD/CAM D Engineer During this period I worked for R&D and was participant of evaluation team for 3D- CAD as a specialist. Technologies and methods: CAD D Engineer, specialist |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Branche |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Telekommunikation Verteidigung und Sicherheit | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Kenntnisse |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Ausbildung & Zertifikate |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
k.A | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sprachen |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
deutsch | (+) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
englisch | (++++) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
finnisch | (++++) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
schwedisch | (++) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sonstiges |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Wir freuen uns auf Sie...
people4project GmbH
Lörenskogstr. 3
85748 Garching b. München
Tel: +49 (89) 55 29 39 -40
 Google Map | Kontakt
wir sind Recruiting-Spezialisten für die temporäre Unterstützung von IT Entwicklungs- und Betriebsthemen, sowie das Managen von Freelancer-Einsätzen bei unseren Kunden.