people4project GmbH
Lörenskogstr. 3
85748 Garching b. München
Mo-Fr 9.oo - 17.oo Uhr
+49 (89) 55 29 39 -40
Projekte im Werdegang |
|||||||||||||||||||||||||||||||||||||||||
06/2006 - | SAP-PA - Personnel Administration General, SAP-R3 Period ¿ July 2006 Company Reconciliation program CO-PA project SAP R/3 4.6C environment Senior Consultant CO |
||||||||||||||||||||||||||||||||||||||||
03/2006 - | SAP-PP - Product Planning, SAP-R3 Period ¿ May 2006 Customer Wavin, The Netherlands (Plastic pipelines) Accenture Company European template project. Modules: FI, CO-OCM, CO-PC, MM, SD, Description of project PP. CO Product Costing Blue Print and Build Description of role Pilot SAP R/3 4.7 environment Senior Consultant CO, Pilot |
||||||||||||||||||||||||||||||||||||||||
08/2005 - | SAP-R3 Period ¿ November 2005 Customer Contracting Almarai, Saudi Arabia (Milk and dairy products) Blue print configuration and user acceptance Description of role testing SAP R/3 4.6C environment Senior Consultant CO, Product Costing pilot, pilot |
||||||||||||||||||||||||||||||||||||||||
06/2004 - | SAP-PP - Product Planning, SAP-R3 Period ¿ July 2005 Customer Contracting SABIC: Saudi Arabian Basic Industry Company (Chemicals) Atos Origin Middle East Company FANAR project to integrate the IT of 20 manufacturing affiliates and head office in Saudi Arabia, plus sales offices in US, Europe project § HR, FI, CO-OCM/PC/ML/PA/PCA, MM, SD, PM, PP, PS § Two phases: (1) development of a kernel (2) roll-out of the kernel to all sites in four ¿waves¿ role § two affiliates in Wave 3 SAP R/3 4.6C environment Lead Consultant CO, head |
||||||||||||||||||||||||||||||||||||||||
02/2002 - | SAP-PP - Product Planning, SAP-R3 Period ¿ May 2003 Customer Contracting SABIC: Saudi Arabian Basic Industry Company (Chemicals) Origin Middle East Company Description of See above project Lead consultant in the CO area for: § The development of the CO kernel for Overhead Cost Management, Product Costing/ Material Ledger, Profitability Analysis and Profit Center Accounting; Description of § The integration with the PP, PM and PS modules; role During this assignment Wave-1 was rolled out: § Head office (procurement); § One manufacturing affiliate in Saudi Arabia; § All overseas sales offices SAP R/3 4.6C environment Lead Consultant CO, Lead consultant, Head |
||||||||||||||||||||||||||||||||||||||||
11/2001 - | Pharmacy, SAP-R3 Janssen Cilag, The Netherlands (Pharmaceuticals Customer wholesaler) Perfect for People Company § Setting the outline for future business scenario SAP R/3 4.6C environment Senior, wholesaler |
||||||||||||||||||||||||||||||||||||||||
08/2001 - | Transportation/Shipping, SAP - Industry Solutions, SAP-R3 quarter) Customer Contracting Gasunie, The Netherlands (Gas transportation) Perfect for People, Accenture Company Description of Extension of the productive R/3 system with IS-U Billing project Description of role Defining solutions for various identified system gaps in SAP SAP R/3 IS-U 4.6B environment Senior Consultant FICO |
||||||||||||||||||||||||||||||||||||||||
03/2001 - | ABAP, Unit Testing, SAP-R3 Period ¿ July 2001 Seminis Vegetable Seeds, The Netherlands (Wholesale Customer trade) Perfect for People Company Description of project Conversion of 8 French legal entities into one single legal entity Responsible for the conversion of FI and CO-OCM: § Design of migration, controls and audit trail; § Specifications of ABAP transfer programs and unit testing; § Executing Integration test and final conversion SAP R/3 4.5B environment Senior Consultant FICO |
||||||||||||||||||||||||||||||||||||||||
01/2001 - | FICO on release 4.6B
|
||||||||||||||||||||||||||||||||||||||||
01/2001 - | BiW on release 2.1B
|
||||||||||||||||||||||||||||||||||||||||
01/1999 - | FICO on release 4.0B
|
||||||||||||||||||||||||||||||||||||||||
08/1998 - | Mineral Oil, Gas, IBM Mainframe, SAP-R3 Period ¿ July 2000 Customer Contracting Saudi Aramco Oil Company, Saudi Arabia Origin Middle East Company Large SAP implementation in the Oil industry with modules: FI, CO- CCA, HR, MM, SD, PM, PS and BW. Description of Objective of the Business System Integration Project (BSIP) was to project replace over 300 mainframe systems. The BSIP project totaled over 400 project team members role Technical During this assignment three companies went productive SAP R/3 4.6B and IS-Oil 4.0B environment CO Lead Consultant, consultant |
||||||||||||||||||||||||||||||||||||||||
01/1998 - | SAP-R3 SAP R/3 FICO on release 3.x Certifications |
||||||||||||||||||||||||||||||||||||||||
10/1997 - | SAP-PP - Product Planning, SAP-CO - Controlling Period ¿ July 1998 Customer Wavin Benelux, The Netherlands (Plastic pipelines) Origin NL Company Roll out to NL and Belgium. Modules: FI, CO-CCA, CO-PC, MM, SD, PP. Objective of the project was to get a millennium proof and Euro Description of project ready system in place Team leader FICO, During |
||||||||||||||||||||||||||||||||||||||||
04/1997 - | SAP-R3, IT-Consulting/IT-Support SAP R/3 3.1G environment Position Consultant FI ¿ September 1997 Customer Tax Department of The Netherlands (Government) Period Contracting Origin NL SAP Consultant added to the project team: Company Description of Feasibility study to the pros and cons of SAP for Budget Control project and the Human Resources Department. Description of role Technical SAP R/3 3.0F environment Consultant FI, SAP Consultant |
||||||||||||||||||||||||||||||||||||||||
01/1997 - | SAP-R3 Philip Morris Europe, Swiss (Food) Customer Philips NL, several business units (Consumer Goods) Origin NL Company Description of Major implementations with roll outs in many countries project Description of Responsible for the delivery of Origin¿s service product ¿Secure role Technical R/3¿ for implementing authorizations in R/3 SAP R/3 3.0E, 3.0F, 3.1G environment Consultan Position t FI October Delivery manager R/3 Authorizations, Major, Consultan |
||||||||||||||||||||||||||||||||||||||||
01/1997 - | ¿ March
|
||||||||||||||||||||||||||||||||||||||||
Branche |
|||||||||||||||||||||||||||||||||||||||||
Telekommunikation | |||||||||||||||||||||||||||||||||||||||||
Kenntnisse |
|||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||
Ausbildung & Zertifikate |
|||||||||||||||||||||||||||||||||||||||||
k.A | |||||||||||||||||||||||||||||||||||||||||
Sprachen |
|||||||||||||||||||||||||||||||||||||||||
englisch | (++++) | ||||||||||||||||||||||||||||||||||||||||
französisch | |||||||||||||||||||||||||||||||||||||||||
holländisch | (++++) | ||||||||||||||||||||||||||||||||||||||||
Sonstiges |
|||||||||||||||||||||||||||||||||||||||||
Wir freuen uns auf Sie...
people4project GmbH
Lörenskogstr. 3
85748 Garching b. München
Tel: +49 (89) 55 29 39 -40
 Google Map | Kontakt
wir sind Recruiting-Spezialisten für die temporäre Unterstützung von IT Entwicklungs- und Betriebsthemen, sowie das Managen von Freelancer-Einsätzen bei unseren Kunden.