Projekte im Werdegang |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01/2018 - | Windows, Linux, Hyper-V, Firewall, Redis, SQL Moosend Remotely Design, configuration, migration and monitoring of the infrastructure. This is a part time project which I have worked on remotely. As lead infrastructure engineer I was responsible for design, configuration, migration and monitoring of the infrastructure. I have been dealing with different technologies including here AWS, Azure Windows, Linux etc. Task finished by me Designed the new infrastructure Installed the Windows Server 2016 Configured Windows Server 2016 Installed Hyper-V Configured virtualization Configured firewalls Configured Load Balancers Installed, configured, migrated and monitored RabbitMQ Installed, configured, migrated and monitored Redis Installed IISs Installed SQL failover cluster Installed and configured different monitoring tools Testing Lead infrastructure Engineer |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01/2017 - | VMware, Oracle, Storage Remotely Develop computerised Integrated Tariff Management System (ITMS). The project objective is to analyse system, design, develop and implement an Integrated Tariff Management System. As System Designer, I was responsible for design of hardware and software infrastructure, Technologies used: VMware, Red Hat, Oracle, Dell Servers, EMC Storages, Cisco Networking System engineer |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03/2016 - 06/2016 | .net, Hyper-V, MS SQL Server Remotely Design, supply and install the supporting IT Infrastructure of Sigma Vienna Insurance Group - Branch. The project objective was to analyse current system, design, supply and implement deployment of hardware infrastructure to support all IT services for the insurance company according to legislation. Scope of the project was installation of hardware and configuration of all IT services (AD, Exchange, File server, Databases) Applications). As System Engineer I was responsible for design and implementation of hardware and software infrastructure, designing the system, leading the team of engineers, ensuring that the system is implemented and tested in accordance with the agreed requirements, implementing the system and train IT administrators Technologies used: Microsoft Technologies, .Net, IIS, Hyper-V, SQL Server, NLB Clustering, Dell Servers, Dell Storage System engineer |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09/2015 - 02/2016 | Cisco Remotely Modernisation of Police Network: provision of IT equipment for upgrading the IT Network of the Police, Police Directorate and Central Servers. The project objective was to analyse current IT Network, design, develop and implement an new IT network to support the Police IT infrastructure. As System Engineer I was responsible for design and implementation of hardware and software infrastructure, designing the system, leading the team of engineers, ensuring that the system is implemented and tested in accordance with the agreed requirements, implementing the system and train IT administrators. Technologies used: Cisco Technologies System designer/project manager |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07/2014 - 07/2015 | .net, Hyper-V, MS SQL Server Remotely Design, supply and install the supporting IT Infrastructure of Sigal Uniqa Group Austria The project objective was to analyse current system, design, supply and implement deployment of hardware infrastructure to support all IT services for the insurance company according to legislation. Scope of the project was installation of hardware and configuration of all IT services (AD, Exchange, File server, Databases) Applications). As System Engineer I was responsible for design and implementation of hardware and software infrastructure, designing the system, leading the team of engineers, ensuring that the system is implemented and tested in accordance with the agreed requirements, implementing the system and train IT administrators Technologies used: Microsoft Technologies, .Net, IIS, Hyper-V, SQL Server, NLB Clustering, Dell Servers, Dell Storage Project manager |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11/2011 - 10/2012 | Linux Remotely Supply, installation, configuration and implementation of EUMETcast satellite system for Airport. The project objective was to implement the satellite system for Airports As System Engineer I was responsible for implementation of hardware and software infrastructure,. Technologies used: Linux, Dell Servers System engineer/ Project manager |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Branche |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Kenntnisse |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Ausbildung & Zertifikate |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03/2017 - 08/2017 | Baruti Gmbh Remotely Implementation of hardware infrastructure and IT services for Baruti Gmbh. The project objective was design of hardware infrastructure and virtualization platform As System Engineer I was responsible for design and implementation of hardware and software infrastructure, designing the system, leading the team of engineers, ensuring that the system is implemented and tested in accordance with the agreed requirements, implementing the system and preparing the training. Technologies used: VMware, Dell Servers, Dell Storage |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01/2016 - 12/2016 | L.L.C Sebtember Remotely Upgrade and maintenance of Software Modules for Advanced Professional Spectrum Management for Regulatory Authority of Electronic and Postal Communications (RAEPC). The project objective was to analyse current system, design, develop and implement an upgrade of Frequency monitoring and management system to support RAEPC and to procure and implement the required supporting hardware and software. As Project Manager, I was responsible for managing all project activities, designing the system, leading the team of developers (two teams, two different countries), ensuring that the system is developed, implemented in VMware infrastructure and tested in accordance with the agreed requirements, implementing the system and preparing the training. Technologies used: VMware, Oracle, Linux, Fujitsu Servers |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10/2015 - 10/2017 | L.L.C Botek L.L.C Upgrade and maintenance of Borders Management System Policing. The project objective was to analyse current system, design, develop and implement an upgrade of Border Management system to support the implementation of Border Management Control according to EU requirements, and to procure and implement the required supporting hardware and software. As Project Manager, I was responsible for managing all project activities, designing the system, leading the team of developers (four teams, three different countries), ensuring that the system is developed and tested in accordance with the agreed requirements, implementing the system and preparing the training. As System Engineer I was responsible for design and implementation of hardware and software infrastructure, designing the system, leading the team of engineers, ensuring that the system is implemented and tested in accordance with the agreed requirements, implementing the system and preparing the training. Technologies used: Microsoft Technologies, .Net, IIS, Hyper-V, SQL Server, NLB, Clustering, Dell Servers, Dell Storage Lützner-Str. 214 04179 Leipzig GERMANY Date of Birth 30/01/1990 Marital Status Single Driving License Category B |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10/2015 - 05/2016 | VPN network. Albanian English Italian Remotely Implementation of VPN network. The project objective was to design, implement an VPN network. As Project Manager, I was responsible for managing all project activities, designing the system, leading the team of network engineers and technical staff, ensuring that the system is implement ed and tested in accordance with the agreed requirements. As System Engineer I was responsible for designing the system and preparing the training. Technologies used: Cisco Technologies, .GetVPN, EIGRP, IIS, Hyper |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10/2015 - 05/2016 | L.L.C Remotely Implementation of hardware infrastructure and IT services for Italian Petrol - Branch. The project objective was design of hardware infrastructure and virtualization platform. As System Engineer I was responsi ble for design and implementation of hardware and software infrastructure, designing the system, leading the team of engineers, ensuring that the system is implemented and tested in accordance with the agreed require ments, implementing the system and preparing the training. Technologies used: Microsoft Technologies, IIS, Hyper-V, SQL Server, NLB, Clustering, Dell Servers, Dell Storage |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01/2015 - | Faculty of Electrical Engineering and Computing, University of Prishtina B.Sc. in Telecommunication Faculty of Electrical Engineering and Computing, University |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08/2014 - 10/2014 | Remotely
Supply, installation and commissioning of hardware equipment for Human Resources
Management Information System (HRMIS) and Payroll System. The project objective was to design, delivery, install and configure computing infrastructure to support Human
Resources Management Information System (HRMIS) and Payroll System
As System Engineer I was responsible for design and implementation of hardware and software infrastructure, designing the system, leading the team of engineers, ensuring that the system is implemented and tested in accordance with the agreed requirements, implementing the system and preparing the training. Technologies used: Microsoft Technologies, .Net, IIS, Hyper-V, SQL Server, NLB, Clustering, Dell
Servers, Dell Storage
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07/2014 - 10/2014 | L.L.C Remotely Expansion of Government Network capacities. The project objective was to design, delivery, install and configure computing infrastructure to support their main IT Services (AD, Exchange, File server etc). Scope of the project was delivery of Dell Blade Servers, design of the architecture and configuration of VMware virtualisation platform and supporting IT Services. . As System Engineer I was responsible for design and implementation of hardware and software infrastructure, designing the system, leading the team of engineers, ensuring that the system is implemented and tested in accordance with the agreed requirements, implementing the system and preparing the training. Technologies used: VMware, Dell Servers, EMC Storage |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10/2013 - 12/2013 | university Remotely Supply and configuration of eLearning system and digital display system The project objective was to design and delivery of a system for display of all university related information across all 22 faculties. As Project Manager, I was responsible for managing all project activities, designing the system, leading the team of developers and integrators, ensuring that the system is developed, implemented and tested in accord ance with the agreed requirements, implementing the system and preparing the training. Technologies used: Linux, Cisco Networking |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01/2013 - 05/2014 | L.L.C Support to the Implementation of Intelligence Led Policing. The project objective is to design, develop and implement a distributed database system to support the implementation of Intelligence Led Policing, and to procure and implement the required supporting hardware and software. As System Engineer I was responsible for design and implementation of hardware and software infrastructure, designing the system, leading the team of engineers, ensuring that the system is implemented and tested in accordance with the agreed requirements, implementing the system and preparing the training. Technologies used: Microsoft Technologies, .Net, IIS Hyper-V, SQL Server, NLB, Clustering, Dell Servers, Dell Storage, Dell Networking |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sprachen |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Albanisch | (++++) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
englisch | (++++) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
italienisch | (+) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sonstiges |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Wir freuen uns auf Sie...
people4project GmbH
Lörenskogstr. 3
85748 Garching b. München
Tel: +49 (89) 55 29 39 -40
 Google Map | Kontakt
wir sind Recruiting-Spezialisten für die temporäre Unterstützung von IT Entwicklungs- und Betriebsthemen, sowie das Managen von Freelancer-Einsätzen bei unseren Kunden.